Emergency Generator Project

  • Wynn Macau (As a sub- con with upgrade emergency generator power system to open/close transition, synchronization to MAINS) 
  • Galaxy Macau (Upgrade PLC System with phase 3A) 
  • Lisboeta (As a sub- con with emergency generator installation and emergency power synchronization system) 
  • Lisboa Palace (As a sub- con with emergency generator installation and emergency power synchronization system) 
  • Royal Hotel (As a sub- con with emergency generator installation) 
  • Broadway Macau (As a sub- con with emergency generator maintenance) 
  • Grand Lisboa (As a sub- con with emergency generator annual maintenance)
  • Assistance of GAS Generator Seminar in Macau JW Hotel with “The Macao Institution of Electrical and Mechanical Engineers” in 2020